Location of dam and HPP
“Tegare” dam and HPP are planned at the middle part of the Drina River course, at the chainage km 148+750. The location belongs to the municipality of Tegare; the nearest town is Ljubovija.
Profile hydrological properties from original documentation
Basic profile hydrological properties (as given in the original technical documentation) are:
- Basin area: 15,437 km2,
- Mean discharge: 333.5 m3/s,
- Ecological flow: 61.6 m3/s and
- Flood discharge referent for design of spillways: 7,192 m3/s (Q0.1).
Dam properties
Basic dam properties are:
- Type: gravity, concrete
- Crest elevation: 203.0 m.a.s.l.,
- Height: 44.3 m (construction height),
- Length along the crest: 649.0 m (concrete part),
- Storage evacuation structures: gated spillways, 8 fields and
- Total evacuation capacity: 8,413 m3/s (8 fields), 7,292 m3/s (7 fields).
Storage properties
Basic storage properties are:
- Regular water level: 200.0 m.a.s.l.,
- Maximum water level: 200.0 m.a.s.l.,
- Minimum operating water level: 198.0 m.a.s.l.,
- Total volume: not determined, negligible,
- Active volume: not determined, negligible and
- Surface area: 12.21 km2.
Conduit properties
The plant belongs to the non-diversion type.
HPP/Powerhouse properties
Basic HPP/powerhouse properties are:
- Plant type: non-diversion,
- Unit type: axial (bulb), double-regulation,
- Number of units: 4,
- Installed discharge: 4 x 200 = 800 m3/s,
- Minimum unit discharge: 50 m3/s (each unit can discharge ecological flow),
- Tailrace water level: 182.20 m.a.s.l. (1 m dredging),
- Gross head: 17.80 m,
- Head loss: 0.4 m,
- Net head: 17.40 m,
- Installed power (active): 4 x 30.22 = 120.88 MW,
- Installed power (apparent): 4 x 36 = 144 MW,
- Mean annual electricity generation: 448 GWh and
- Connection voltage level: 110 kV.
Rated discharge was adopted primarily in the view of the capacity of the upstream “Bajina Bašta” HPP with rehabilitated units and eventual additional fifth unit, as well as the capacity of the downstream “Zvornik” HPP after the planned rehabilitation (replacement) of units and streamlining with a capacity increase.
(Source: IWRM Country Report for Serbia, COWI, Stucky and Jaroslav Cerni Water Institute, 2017)